Skip to content

Safety

The Safety application is where your teams report safety incidents (accidents and near misses) and safety inspection findings, and follow each one until it is closed. Open it from the application launcher: Manufacturing → Safety.

The page has two tabs, Incident and Inspection. Both work the same way: a summary table at the top, a button to write a new entry, and — for users allowed to see logs — a list of every entry, where you can update one.


The summary table

Each tab opens on a table that counts the entries of the last 6 months, one row per period.

Incident tab

Column group Columns
Severity High, Medium, Low, Near miss — how many incidents of each severity
Status Reported (all incidents), Closed, Open, and % of closures (closed ÷ reported)
Accident Accident without loss, Accident with loss

Inspection tab

Column group Columns
Severity High, Medium, Low — how many findings of each severity
Status Findings (all findings), Open, Closed, and % of compliance (closed ÷ findings)

An entry you have just written appears in the table straight away.

Filters

Click Filters to change what the table counts, then Apply:

Filter What it does
Time period One row per Day, Week, Month (the default) or Quarter
Locations Count only the entries of the locations you pick. Leave it empty for all locations
Inspection type (Inspection tab only) Process related or maintenance related findings

The number on the Filters button shows how many filters are in use.

Week labels

In the Week view, each week is labelled by a date at its start.


Writing an incident

Click Write incident and fill in:

Field Notes
Accident, Accident with loss, Closed Tick the ones that apply
Incident description Required; up to 300 characters
Location Required — where it happened. Locations are set up under Settings → Derived & Data Units → Manufacturing → Locations
Date Required; today by default. A future date cannot be picked
Time Optional. Left empty, the incident is recorded at the start of that day
Employee ID Required; up to 25 characters
Severity High (default), Medium, Low or Near miss
Corrective action Required; up to 300 characters

Click Create.

Writing an inspection log

Click Write inspection log and fill in:

Field Notes
Inspector ID Required; up to 25 characters
Location Required
Inspection date Required; today by default
Follow-up date Optional
Findings Required; up to 300 characters
Severity High (default), Medium or Low
Inspection type Process related finding (default) or maintenance related finding
Status Open (default) or Closed
Actions required Required; up to 300 characters

Click Create.


Checking and updating the logs

Users with the logs access right see a Check logs button on each tab. It opens every entry of a date range:

  • Incidents: pick a start and end date and time (the last 30 days up to 3 days ahead by default) and click Fetch.
  • Inspections: pick a from and to date (same default) and click Fetch. The range is on the inspection date.

The table lists each entry with its details and who logged it. To update one, open the ⋮ menu on its row and choose Edit. Once an entry is written, only its outcome can change:

Tab What you can change
Incident Accident with loss, Closed, Corrective action
Inspection Status, Actions required

The description, location, date, severity and the other details stay as they were written. If one of them is wrong, write a new entry.

Closing the loop

The % of closures and % of compliance columns only rise when entries are marked Closed. Make it a habit to update an incident or inspection from Check logs once its corrective action is done.